Causeway Bay seawater pump house intake

Underwater inspection and construction at the seawater intake of a building's cooling-water pump house.

Year
2018
Client
Union King Engineering, for China State Construction
Location
Causeway Bay, Hong Kong Island
Status
Founder's project experience
Category
Underwater & marine

Founder's project experience. Our founder took part in the construction design and site work on this project. It was carried out as part of another company's team, not under the Yan & Partners name.

Large buildings along the Causeway Bay waterfront draw seawater for their cooling systems through intakes below the waterline. The team inspected the intake, recorded its condition in a 3D inspection drawing, and prepared the construction and dimension drawings for the steelwork that was then fixed to the intake underwater.

From the drawings

The intake belongs to the cooling pump house of Windsor House. We built a temporary bulkhead in front of its three Ø400 mm intake pipes, from +5.00 mPD down to the seabed at about −1.00 mPD, with steel posts and walers on M30 stainless bolts, panel bays of 1,530 and 1,220 mm, and cement sandbags packed around the pipes. Two ways of extending the pipe sleeve were drawn: welded on shore, or welded underwater.

Drawings

Construction drawing · 施工圖
Construction drawing · 施工圖
Inspection report, 3D · 檢視報告圖
Inspection report, 3D · 檢視報告圖
Cooling pump house intake, 3D · 冷卻泵房立體圖
Cooling pump house intake, 3D · 冷卻泵房立體圖
Dimension drawing · 施工呎吋圖
Dimension drawing · 施工呎吋圖
Bulkhead over the three Ø400 intakes · 三條直徑400毫米入水管前的封閘
Bulkhead over the three Ø400 intakes · 三條直徑400毫米入水管前的封閘