© Yan & Partners, 2026
EnTc
Hydraulic

Cheung Chau–Lantau water main: finding a leaking joint

A diver inspection of the flanged joint between the steel and fibreglass sections of a submarine water main at −11 PD.

Year
2009
Location
Cheung Chau
Status
Completed
Category
Hydraulic

The submarine water main between Cheung Chau and Lantau changes from steel to fibreglass-reinforced plastic at a flanged joint on the seabed, at about −11 PD. When a leak was suspected there, a diver inspected the joint and marked the leak position on plan and on two sections, so the repair could be planned.

Drawings

Steel-to-FRP joint on the seabed · 海床上的鐵管與玻璃鋼管接口
Steel-to-FRP joint on the seabed · 海床上的鐵管與玻璃鋼管接口