Box culvert desilting, Hoi Fai Road to Olympian City

Diver-operated desilting of a flooded box culvert, with on-site settling and dewatering so only dry spoil leaves the site.

Year
2020 – 2021
Client
Kei's Engineering Limited
Location
West Kowloon
Status
Completed
Category
Hydraulic

A long box culvert between Hoi Fai Road and Olympian City had silted up while still full of water. We compared three methods: a diver-operated sand pump feeding settlement tanks, a 0.3 m³ grab bucket, and jet-pump flushing. We costed each by the volume of solids removed per day.

Chosen method

  • Settlement, percolation and storage tanks, a generator and diving equipment set up at the manhole.
  • A diver, on surface-supplied air with a backup cylinder and constant voice communication, drags a 100 mm sand pump through the culvert.
  • The pump stops when the tanks are full, while the water clears and drains off.
  • Clean water is pumped away, and solids are moved to storage by grab and trucked off site.

Each team: a supervisor, a working diver, a standby diver, a tender and a communicator, working to the confined-space diving code.

Drawings

Method statement · 施工方法及程序
Method statement · 施工方法及程序
Option 1: sand pump and tanks · 方案一
Option 1: sand pump and tanks · 方案一
Option 2: grab bucket · 方案二
Option 2: grab bucket · 方案二
Option 3: jet pump · 方案三
Option 3: jet pump · 方案三
Debris screen for the pump chamber · 清理垃圾泵室裝置
Debris screen for the pump chamber · 清理垃圾泵室裝置