Xiamen–Kinmen fibre cable: burial to 3 m

Two diver teams trenched either side of a 32 mm submarine fibre cable so it lowered itself to 3 m below the seabed, checked every 10 m.

Year
2010
Location
Xiamen–Kinmen strait
Status
Completed
Category
Underwater & marine

The fibre cable between Xiamen and Kinmen had to be buried 3 m deep. It was already laid, so the work was done around it.

  1. A small work boat carrying the equipment set GPS buoys at the start point.
  2. Divers found the cable and filmed a pre-burial video.
  3. Two teams worked either side, one with a water-jet lance and one with a hydraulic suction pipe, digging in stages so the cable settled into the trench by itself.
  4. Burial depth was checked with a cross-staff and on video every 10 m.
  5. The trench was backfilled by jetting and a final video report was made.

Drawings

Jet lance and suction trenching either side of the cable · 在光纜兩側以噴射及吸泥開溝
Jet lance and suction trenching either side of the cable · 在光纜兩側以噴射及吸泥開溝